Akfen Engineering is a company with successful partnerships with its customers in the installation, assembly, personnel training and commissioning of grease refinery facilities in Central Asia, Europe and Africa in grease oil production plant, grease oil refinery plant.
Grease contains between 80% and 95% base oil component. Mineral and Synthetic base oil can be selected. Since the part that gives the lubricating feature of the grease is the base oil, the desired product can be made.
The thickening products that give the grease oil its density are usually calcium lithium aluminum soaps and clay polyurea.
Grease oil is mostly preferred in air, sea and land vehicles due to their high performance.
Grease oil is an ideal choice, especially for applications under high temperature and pressure conditions. It exhibits superior performance between -40 and 250 degrees. Provides protection of parts against rust. It does not lose its features even in long-term use and prolongs the new oil application.
Equipment to be included in the Grease manufacturing plant are as follows:
1. Raw Material Tanks
2. End Product Tanks
3. Manufacturing Mixers
4. Frost Oil Melting Furnace
5. Plant Process and Automation Processes
6. Stock Field
7. Automatic or semi-automatic filling machines
8. Circulation and pressing pumps
9. Laboratory and testers
10. Weighbridges and scales
grease oil blending plant, grease oil blending plant
MODELLER |
AK-GY 5 |
AK-GY 10 |
AK-GY 20 |
AK-GY 30 |
AK |
|
Daily Processing Capacity |
5.000 LT |
10.000 LT |
20.000 LT |
30.000 LT |
|
|
Total Processing Type |
8 Hours |
8 Hours |
8 Hours |
8 Hours |
||
Required Factory Field |
200 m2 |
300 m2 |
500 m2 |
600 m2 |
||
Heating Type |
Hot Oil Boiler, Steam Boiler or Electric Resistance |
|||||
Products to Be Produced |
White Grease, Bearing Grease, Red Grease, Green Rubber Grease |
|||||
Raw materials |
SN-80, SN-150, SN-300, SN-500 Base Oil and Recycling Base Oil |
|||||
Heating Fuel |
Diesel, Fuel Oil, Gas and Electricity |
|||||
Operation System |
Loadcell Automation System or Semi-Automatic Manual System |
|||||
Lab |
Standard Basic Laboratory Equipments are Required for System Operation |
|||||
Necessary Manpower |
1 Senior Engineer 1 Personnel |
1 Senior Engineer 2 Personnels |
1 Senior Engineer 3 Personnels |
1 Senior Engineer 3 Personnels |
||
Delivery time |
40 Workdays |
45 Workdays |
50 Workdays |
60 Workdays |
||
Assembly time |
5 Workdays |
10 Workdays |
15 Workdays |
15 Workdays |